Natural slate, hooked or nailed

One slate after another, for the life of the house.

Slate, tiles and zinc laid by hand, old roofs repaired piece by piece. We climb up and take photos, then we write the quote.

Before the first slate comes off

Four things you can check

Ten-year insurance

The certificate comes with every quote.

RGE certified

The condition for insulation grants.

Safety before climbing

Scaffolding or guardrails in place before the first tile comes off.

Site left clean

Old tiles and offcuts taken away, gutters emptied.

Recent jobs

Roofs laid course by course

Each joint falls on the middle of the slate below: that is what keeps the rain out.

Interlocking clay tiles

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

Rezé12 days2025

Natural slate, hooked

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

Orvault4 weeks2025

Natural zinc

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

Nantes9 days2024

Roof windows and flashing kits

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

Carquefou3 days2025

Treated softwood

Rafters replaced before re-roofing

Rotten rafters found when stripping the roof, replaced before the new covering went on.

Vertou6 days2024

Reclaimed canal tiles

Canal tiles re-laid on a stone house

Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.

Saint-Sébastien-sur-Loire8 days2024

Old slate and lichen: a roof that has held for a century can hold for another one.

From the first call to the handover

How a roofing job goes

Course 1

We come and look

We climb onto the roof before pricing anything, and send you the photos of what we saw.

Course 2

A written, detailed quote

Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.

Course 3

The work, on the agreed dates

The roof is made watertight every evening, even halfway through the job.

Course 4

Handover and guarantee

We walk round the job with you and you sign the handover: the ten-year cover starts that day.

Good to know

Before you sign anything for your roof

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

How soon we come, town by town

Where we work

Carquefou

44470

within 48 h

La Chapelle-sur-Erdre

44240

within 48 h

Nantes

44000

within 24 h

Orvault

44700

within 48 h

Rezé

44400

within 24 h

Saint-Herblain

44800

within 24 h

Saint-Sébastien-sur-Loire

44230

within 24 h

Vertou

44120

within 48 h

Once the scaffolding came down

What customers said

"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V., Slate roof renewal, Carquefou
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M., Leak repair, Orvault
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L., Storm tarping, Rezé

Visit and quote free of charge

Tell us about your roof

Slate, tiles or zinc, and the area if you know it. We come and look before giving any figure.

Or call01 23 45 67 89