
Interlocking clay tiles
Roof renewed, dormer restored
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Rezé12 days2025

Natural slate, hooked or nailed
Slate, tiles and zinc laid by hand, old roofs repaired piece by piece. We climb up and take photos, then we write the quote.
Before the first slate comes off
The certificate comes with every quote.
The condition for insulation grants.
Scaffolding or guardrails in place before the first tile comes off.
Old tiles and offcuts taken away, gutters emptied.
The trade, piece by piece

Tiles blown off, a branch through the roof: we make it watertight the same day and document everything for your insurer.
from €290

A stain on the ceiling rarely sits under the leak. We find where the water really gets in, then repair only what needs repairing.
from €180

Clay tiles, battens and underlay renewed, the rafters checked on the way: a roof done for the next fifty years.
from €120 per m²

Natural slate, hooked or nailed, laid by hand: the roof of the region, for the life of the house.
from €160 per m²

Gutters, downpipes, flashings and ridge in zinc, shaped and soldered on site to fit your roof.
from €55 per metre

Moss removed by hand and a treatment applied, only when the roof needs it. We tell you when it does not.
from €18 per m²
Recent jobs
Each joint falls on the middle of the slate below: that is what keeps the rain out.

Interlocking clay tiles
A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.
Rezé12 days2025

Natural slate, hooked
A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.
Orvault4 weeks2025

Natural zinc
A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.
Nantes9 days2024

Roof windows and flashing kits
A dark loft turned into two bedrooms, three windows cut into the tiled slope.
Carquefou3 days2025

Treated softwood
Rotten rafters found when stripping the roof, replaced before the new covering went on.
Vertou6 days2024

Reclaimed canal tiles
Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.
Saint-Sébastien-sur-Loire8 days2024

From the first call to the handover
Course 1
We climb onto the roof before pricing anything, and send you the photos of what we saw.
Course 2
Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.
Course 3
The roof is made watertight every evening, even halfway through the job.
Course 4
We walk round the job with you and you sign the handover: the ten-year cover starts that day.
Good to know
Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.
It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.
A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.
Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.
We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.
For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.
How soon we come, town by town
Carquefou
44470
within 48 h
La Chapelle-sur-Erdre
44240
within 48 h
Nantes
44000
within 24 h
Orvault
44700
within 48 h
Rezé
44400
within 24 h
Saint-Herblain
44800
within 24 h
Saint-Sébastien-sur-Loire
44230
within 24 h
Vertou
44120
within 48 h
Once the scaffolding came down
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Visit and quote free of charge
Slate, tiles or zinc, and the area if you know it. We come and look before giving any figure.
Or call01 23 45 67 89